The Minnesota Department of Transportation will close the inside lines of Hwy 36 between Osgood Avenue and Beach Road in Stillwater from 9 a.m. to 3 p.m. Friday. Crews will collect soil boring samples in the median in that area.
The work is preliminary information gathering for the St. Croix Crossing project.
Roadwork on Hwy. 36 begins at 9 a.m.
The Minnesota Department of Transportation will close the inside lines of Hwy 36 between Osgood Avenue and Beach Road in Stillwater from 9 a.m. to 3 p.m. Friday.
January 28, 2013 at 11:22AM
It’s too soon to tell how much the immigration crackdown is to blame.