Bachmann: State shutdown shows need for new Stillwater Bridge

Help won't come by July 1

June 24, 2011 at 5:25PM
(The Minnesota Star Tribune)
Bachmann and Gov. Dayton on bridge
Bachmann and Gov. Dayton on bridge (The Minnesota Star Tribune)

The prospect of the Stillwater Lift Bridge being locked in the 'up' position during the looming state government shutdown has U.S. Rep. Michele Bachmann reminding everyone of the urgency of a new St. Croix River crossing. Bachmann, who represents the district as she runs for president, urged Congress on Friday to give "immediate attention" to bills she and Sen. Amy Klobuchar have introduced allowing a river crossing to move forward. It's doubtful relief is coming from Congress by the July 1 deadline for a budget deal in Minnesota, but, as they say in Washington, never let a crisis go to waste. Federal regulation, Bachmann also noted, require drawbridges (which includes lift bridges) to be left open if operator service is not available.

about the writer

about the writer

Kevin Diaz

Reporter

Kevin Diaz is politics editor at the Star Tribune.

See Moreicon