Road work on eastbound 94 at Huron Blvd. has traffic knotted up from the Lowry Hill Tunnel over to Franklin Avenue. That noise wall work taking out the right lane will be in place until 2 p.m. daily through Nov. 24.
Traffic is starting to pick up the pace on northbound 35W. A crash has been moved from the HOT lane at Hwy. 13 over to the right shoulder. North of that, expect tight conditions from Crosstown to downtown Minneapolis.
Look for sluggish traffic on southbound Hwy. 100 from 94 to Duluth Street even though a crash involving a school bus is on the northbound side at France Avenue.
Eastbound 394 is slower than normal due to a stall way ahead on the ramp from east 94 to south 35W.
Here are some current travel times:
North metro
Southbound 35W from 95th Avenue to downtown Minneapolis: 26 minutes
Southbound 35E from County J to I-94: 23 minutes.