A stalled vehicle blocking the left lane on the Bloomington Ferry Bridge is adding to the crammed conditions that have persisted all morning. This is the third incident on the bridge this morning, making the northbound trip longer than usual. Plan on 15 minutes from Canterbury Road up to 494.
8:10 a.m. update: New stall on Bloomington Ferry Bridge
A stalled vehicle blocking the left lane on the Bloomington Ferry Bridge is adding to the crammed conditions that have persisted all morning. This is the third incident on the bridge this morning, making the northbound trip longer than usual. Plan on 15 minutes from Canterbury Road up to 494.
July 14, 2014 at 1:10PM
It’s too soon to tell how much the immigration crackdown is to blame.