LP SmartSide® is the new high-end siding of choice here in Minnesota. It used to be stucco, but moisture intrusion problems with stucco siding made many high-end home builders start using James Hardie siding. In the last few years, this his changed. Today, I rarely see James Hardie siding used on new homes any more; builders are using LP SmartSide® instead.

LP SmartSide® is a great product that I have yet to find a single failure on, but I suspect I'll be seeing failures soon enough, because I find installation errors on nearly every home I inspect. If you install LP SmartSide®, don't make these mistakes. If you're buying a home with LP SmartSide® or you're having it put on your own house, watch out for these mistakes. If you're a home inspector. .. well, you see where I'm going with this. Check this stuff. These are the most common mistakes being made by installers today.

Missing Paint

Without a doubt, the most common installation error that I find with LP SmartSide® is missing paint at the cut edges. The manufacturer requires all exposed surfaces to be primed and painted.

Overdriven Nails

This is another common defect. Here's a small collage of overdriven nails.

The diagram below shows the appropriate repair methods for overdriven nails.

Insufficient Clearance

The manufacturer requires 6" of clearance from the siding to the finished grade. It seems that almost every home has one or two areas where this clearance requirement isn't met.

The manufacturer also requires 1" clearance to shingles. This is usually done right, but not always.

The manufacturer requires a 3/8" gap above windows and other similar penetrations.

This is rarely done.

A 3/8" gap is a BIG gap. Even when a gap is left here, it's usually not what the manufacturer requires.

Improper butt joints

The manufacturer requires a 3/16" gap at the end of each piece of siding. This includes butt joints, and places where the siding terminates vertically against windows, doors, and other fixtures.

A 3/16" gap is a pretty large gap. Here's what a proper 3/16" gap looks like:

Insufficient kickout flashing

Kickout flashing is a piece of metal at a roof end that prevents water from leaking into the wall. See below.

LP SmartSide® requires flashing to have a 4" upper leg. This means the kickout flashing needs to be 4" high. This usually isn't done.

Joint Treatments

There are three options for keeping water out of the butt joints. The first and second options are to have the joints caulked or have joint molding installed.

The third option is to have flashing at least 4" wide installed at the joints, as long as the ends of the siding are factory finished, and the siding is prefinished by an approved or preferred prefinisher. That means no cut edges at the butt joints. When field-cut edges are present, flashing at the joints is not an appropriate installation method.

Conclusion

That wraps up my list of the most common installation defects for LP SmartSide®. Again, this is not a full list of defects. For the full list of installation instructions, and for more information on this product, click here: http://lpcorp.com/products/siding/lp-smartside-trim-siding/. Why does this stuff matter? Because if the product fails as a result of an improper installation, the manufacturer will not cover repairs.

Related Posts:

Author: Reuben Saltzman, Structure Tech Home Inspections