As drivers try to avoid the tie-up on northbound Hwy. 169 at the Bloomington Ferry Bridge, you can expect heavier levels of traffic on eastbound Hwy. 212 through Eden Prairie. It's 15 minutes from Hwy. 101 over to 494 with congestion from Eden Prairie Road over to 494.

Southbound 35W is hampered by a stall on the right shoulder at Hwy. 10. It's stacked up from Lake Drive to 694.

Northbound Hwy. 169 is crammed from prior to Canterbury Road over the Bloomington Ferry Bridge. Hang in there, as that project is supposed to wrap up in 10 days.

Plan on 15 minutes on northbound 35W from County Road 42 up to 94th Street. Look for a stall on the ramp to 106th Street.