In the past few minutes, MnDOT crews have picked up the last of the cones on eastbound 94 in the Albertville area and all lanes are now open.

But traffic is still backed up to Hwy. 25 in Monticello, so it will take a while for things to shake loose.

Ahead, things are moving swiftly all the way through Maple Grove.

Southbound 35W is starting to fill in from Lake Drive to 694. It's only 10 minutes, however, to reach Hwy. 280.

One stall on the system at this hour. That is on southbound Hwy. 169 at Bren Road. It's on the right shoulder.