Error 502 Ray ID: 17dd2cdbe7c40098

Bad gateway

You

Browser

Working
Ashburn

CloudFlare

Working
users.startribune.com

Host

Error

What happened?

The web server reported a bad gateway error.

What can I do?

Please try again in a few minutes.

Stillwater Lift Bridge fully operational

  • Updated: June 19, 2013 - 9:54 PM
hide

Ben Slagle, 2, played near the Stillwater Lift Bridge earlier this week as it was being repaired by MnDOT. His mother was nearby.

Photo: ELIZABETH FLORES • eflores@startribune.com,

CameraStar Tribune photo galleries

Cameraview larger

Vehicles are once again traveling across the Stillwater Lift Bridge, and boat traffic is able to pass under it after the Minnesota Department of Transportation (MnDOT) on Wednesday afternoon completed repairs on a frayed cable on the 82-year-old span.

The bridge was closed in its lowered position as a precaution on Sunday night when crews noticed the damaged cable that hoists the bridge vertically 57 feet above the normal level of the St. Croix River to let boats pass under it. The normal lift schedule was suspended and the lift span was in the down position until repairs were completed.

The bridge closed at noon Wednesday to vehicles to allow the repairs to be done and allow inspection of the lift system. It reopened by 4 p.m. and was back to normal operations.

MnDOT officials initially were unable to find a replacement cable locally, and feared a delay in repairs, but one was located.

Jim Anderson

  • get related content delivered to your inbox

  • manage my email subscriptions

ADVERTISEMENT

Connect with twitterConnect with facebookConnect with Google+Connect with PinterestConnect with PinterestConnect with RssfeedConnect with email newsletters

ADVERTISEMENT

ADVERTISEMENT

ADVERTISEMENT

ADVERTISEMENT

ADVERTISEMENT

 
Close